LENR and the Climate Debate

Since climate change is front and center in the news, after President Trump announced that the United States’ withdrawl from the Paris Climate Accord, I thought it might be appropriate to broach the topic here. Andrea Rossi has made a lengthy comment on the Journal of Nuclear Physics on the topic that I thought would […]
Posted in Uncategorized | Tagged

LENR Article in a German Newspaper

The following post has been submitted by Wilfried Lesnik  Dear Ladies and Gentlemans, I would like to draw your intention to an article which was released on May 30th 2017 in the Berliner Zeitung, a Berlin newspaper. It sums up the events regarding LENR starting with Fleischmann & Pons until the recent ones, including all […]
Posted in Uncategorized | Tagged

LENR is Not So Easy, But Worth the Effort

For many years now we have seen various efforts to demonstrate clear LENR reactions in an open setting, and so far this has proven to be a rather elusive goal. The recent attempt by the Martin Fleischmann Memorial Project to test a reactor of Me356 is another disappointment which leaves many questions unanswered. My takeaway […]
Posted in Uncategorized | Tagged

MFMP and Me356 Testing — Monday, May 29

Here’s a new thread for another day of testing by the Martin Fleischmann Memorial Project who are going again to visit Me356. From the testing so far, there has been no clear evidence that Me356 has a working LENR reactor. Me356 has posted some comments on the previous thread explaining that he has been working […]
Posted in Uncategorized | Tagged

MFMP and Me356 Testing — Saturday May 27

Here is a new thread for a new day of potential testing by the Martin Fleischmann Memorial Project of Me356’s claimed LENR system. Friday’s testing did not show excess energy from the sparge testing, and the MFMP had planned to return today for continued work. There have some posts by Bob Greenyer on the previous […]
Posted in Uncategorized | Tagged

MFMP and Me356 Testing — Saturday May 27

Here is a new thread for a new day of potential testing by the Martin Fleischmann Memorial Project of Me356’s claimed LENR system. Friday’s testing did not show excess energy from the sparge testing, and the MFMP had planned to return today for continued work. There have some posts by Bob Greenyer on the previous […]
Posted in Uncategorized | Tagged

Friday May 26, MFMP Testing Me356 LENR Reactor

Here’s a new thread dedicated to the actual testing by the Martin Fleischmann Memorial Project of the claimed LENR reactor that has been built by researcher “Me356”. Recent posts have dealt with the preparation the MFMP team has been making for the testing, but I thought it would be appropriate to start a new thread […]
Posted in Uncategorized | Tagged

MFMP on Site Preparing for Me356 Testing

The latest updates from the Martin Fleischmann Memorial Project report that they are getting things set up for testing of the Me356 LENR system. The team of Bob Greenyer, Alan Goldwater, Ryan Hunt and Brian Albiston are now on site somewhere in the Czech Republic (the exact location has not been reported). The best information I […]
Posted in Uncategorized | Tagged

Brilliant Light Power’s Initial Commercial Launch to be a “Thermal” SunCell

The following post has been submitted by Dr. Mike Brilliant Light Power’s Initial Commercial Launch to be a “Thermal” SunCell 5/21/2017 According to Brilliant Light Power’s website:  https://brilliantlightpower.com/ , their initial commercial launch will now be a “thermal” SunCell with the electrical SunCell based on concentrator photovoltaic (CPV) cells to follow sometime later.  (Their new plan […]
Posted in Uncategorized | Tagged